
Operational intelligence layer inside TruSolve
Operational surfaces
Enter the system,
not a demo.
Each entry point routes to the same preview operational surfaces used for ScopeOps, ESX assembly, claim packets, and Finance supervision.
ScopeOps Overview
Operational command surface for claim pipeline, field activity, and execution state.
ScopeOps Jobs
Open the operational job list and move from field state into claim assembly.
Start Claim
Begin the contractor flow from CRM import or manual claim setup.
Detached Oracle
Voice-first scope drafting before customer or claim metadata is attached.
Finance Command
Policy, approval, exception, and decision record supervision.
Intelligence Console
Read-only operational continuity guidance grounded in verified state.
Reads operational state
Jobs, evidence, scope, measurements, workflow position — Verix observes what the system knows and what it doesn't.
Surfaces what matters
Blockers, missing evidence, denial risk, readiness gaps, supplement opportunities — derived from verified records.
Guides the next action
Every response ends with a concrete directive grounded in system state. No speculation. No invented readiness.
Intelligence output
What Verix surfaces.
Denial Risk
- Installation defect signaled — defend with manufacturer spec compliance + nailing pattern photos
- Cosmetic-only language present — strengthen with functional-damage close-ups
- No-storm-event language present — verify with NOAA weather data
- Late-reporting signal — document any delay justification
Supplement Opportunity
- Valley metal (W-metal) — missing from scope, required at every valley intersection
- Kick-out flashing — absent at roof-to-wall terminations
- Ice & water shield extension — beyond code minimum at eaves
- Starter course on rakes — required for wind-warranty compliance
Operational State
- Scope completeness: 73% — 4 line items lack collateral evidence
- Carrier friction: State Farm — brittle test commonly required
- Photos at 8 of 12 required positions — packet unlocks at full capture
- Inactive 47 days — staleness threshold approaching
Derived from operational records · zero promotional language
Process
How it works.
Capture field activity
Photos, measurements, spoken observations, and inspection notes flow into TruSolve through Oracle — the field extraction layer.
Interpret operational state
Verix reads the captured data alongside scope, evidence chains, and workflow position to understand what the system knows.
Guide the next action
Verix surfaces blockers, missing items, readiness gaps, and the next concrete step — grounded in evidence, not speculation.
Deterministic logic decides.
Intelligence explains.
AI providers power synthesis and explanation — they never override policy, mutate records, or invent readiness. Every answer is grounded in actual operational state.
No policy overrides
No record mutation
No invented readiness
No speculative inference
Depth
Grounded in deterministic
dictionaries.
Every term, pattern, and rule is committed code — auditable in the repository.
125
Insurance terms
11
Denial categories
31
Supplement patterns
15
Carrier profiles
132
Shorthand rules
30
Slope patterns
See it in action.
Ask Verix about operational state — blockers, evidence gaps, denial risk, and next actions.
